Monday, September 9, 2013

Front Nine Fairway Aerification & Collars this Week




Today we will be aerifying a few front nine fairways; 2, 7, 8 & 9.  Click on the above 30 second video to see the machine in action.

After the plugs dry we drag them to break up the soil & thatch.
 


After the drag is finished we blow the thatch off of the fairways with the big blower.





 
This is what we are ultimately trying to remove while the soil breaks off of these plugs and returns into the thatch.


 

My Year in Pictures - 2025

Spring 2025, 4 tee and it's always great seeing our snow mold sprays working as planned. The spring GCIP site visit. The spring irrigati...

Blog Archive