Monday, September 9, 2013

Front Nine Fairway Aerification & Collars this Week




Today we will be aerifying a few front nine fairways; 2, 7, 8 & 9.  Click on the above 30 second video to see the machine in action.

After the plugs dry we drag them to break up the soil & thatch.
 


After the drag is finished we blow the thatch off of the fairways with the big blower.





 
This is what we are ultimately trying to remove while the soil breaks off of these plugs and returns into the thatch.


 

Tree Trimming on 8 in the Power Lines and Around the Course in Pictures

Overnight on Monday, July 27th, another storm came through the region.  This one brought down a lot of white pine limbs along the property l...

Blog Archive